Journal.

Learn more about our design philosophy and recent projects. 

Conceptual car porch showing an open vehicle door competing with the walking route towards the house entrance

The Car Fits in Our Porch, but We Can Barely Walk Past It: What Should Change?

Check car doors, passenger needs and the route home with a scaled porch example and measurement sheet. Compare layout changes before enlarging the porch.
Conceptual corner terrace side garden with outdoor seating, a planted edge and a path beside the house

Our Corner Terrace Has Extra Side Space: Should It Become a Garden, Play Area or Larger Living Room?

Compare a garden, play area and possible living-room extension for corner terrace side space. Test weekly use, privacy, access and planning questions.
Conceptual living-room entrance with an offset timber screen, side daylight and a clear walking route

Our Front Door Opens Straight Into the Living Room: How Can We Get More Privacy?

Compare furniture changes, an offset screen and a small lobby when your front door opens into the living room. Protect privacy, daylight and clear access.
Conceptual cutaway of a terrace house with a planted lightwell beside the dining area

Will a Lightwell Make Our Terrace Brighter or Take Too Much Living Space?

Compare two terrace lightwell layouts using the same room brief. Assess usable area, daylight, maintenance and smaller changes before choosing a design.
Conceptual upstairs bedroom beneath a pitched roof at dusk, with a window, fan and air-conditioner

Why Is Our Upstairs Bedroom Still Hot at Night? What to Check Before Replacing the Air-Con

Is your upstairs bedroom still hot at night? Use a seven-day observation log to compare exposure, room use and air-con issues before choosing improvements.
House with planted ground courtyard and shallow extensive green roof without people

Designing Gardens and Green Roofs Into the Home

Plan gardens and green roofs with clear purpose, structural coordination, water management and realistic maintenance for a Singapore landed home.
Tropical garden in gentle rain with a clear linear drain beside paved walkway

Rainwater, Drainage and Landscape on Landed Plots

Plan rainwater, drainage and landscape together on a landed plot. Review levels, thresholds, maintenance access and professional design responsibilities.
Tropical garden with planted beds, clear walkway and visible surface drainage edge

Landscape and Water in a Landed Home

Coordinate landscape and water in a landed home through thoughtful planting, levels, drainage and maintenance, with practical questions for your design team.
Practical kitchen with built-in appliances and a simple single lever tap

Energy and Water Efficiency at Home

Improve energy and water efficiency at home through suitable products, realistic demand, coordinated installation and practical operating information.
Contemporary tropical home with restrained greenery and thoughtful shading

Green Mark and Sustainability for Landed Homes

Understand Green Mark and sustainability for landed homes, including current standards, evidence, project applicability and accurate certification claims.

© 2026 Joya Architects Pre Ltd.

© 2025 Joya Architects Pre Ltd.