
Form with Purpose. Architecture with Soul.
WHY CHOOSE US
JOYA Architects is a Singapore-based architectural practice dedicated to crafting meaningful, enduring spaces with a distinct focus on private residential landed homes. Guided by experience and grounded by purpose, our design process begins with listening — to the land, the brief, and most importantly, the people who will inhabit the space.
We believe that good architecture is not about spectacle, but about clarity — in form, function, and feeling. Every home we design is a translation of our clients’ needs, desires, and lifestyle into a built reality that is both pragmatic and poetic. Whether navigating tight urban plots, sloping terrain, or multigenerational living requirements, we approach each site with sensitivity and ingenuity.
At JOYA, we see architecture as a legacy — something to be lived in, loved, and passed down. Our work distills beauty from simplicity, drawing on honest materials and purposeful forms to create timeless homes that quietly enrich everyday life.
FIND US
159 Sin Ming Road,
#04-04ASingapore, 575625
CALL US
+65 9192 0393
EMAIL US
hello@joyaarchitects.com

ABOUT US

John Lau
Co-Founder of JOYA Architects
John is a registered architect in Singapore and a member of the Singapore Institute of Architects. He began his career at Metaphor Design + Architecture in 2017 before joining a main contractor to deepen his hands-on understanding of construction and detailing.
He remains deeply involved across all phases of each project — from concept design to completion — ensuring that every home is resolved with care, precision, and architectural integrity.

Alvin Yong
Co-Founder of JOYA Architects
Alvin co-founded JOYA Architects and Yang’s Inspiration Design, a leading interior design firm in Singapore. Since 2017, he has been passionate about making quality design accessible and meaningful.
At JOYA, he leads business development and client engagement, helping homeowners realise not just their dream homes, but better ways of living through design.

Damien Ng
Co-Founder of JOYA Architects
Damien began his design career with a main contractor, where he delivered several well-received residential projects. He also co-founded Decor 8 Interior Design, building a reputation for honest, thoughtful design.
At JOYA, Damien leads the design development process, working closely with clients to bring their vision to life with care, clarity, and creativity.
SERVICES

Architects
At JOYA Architects, we specialise in private landed residential design — from Good Class Bungalows and detached houses to semi-detached and inter-terrace homes. We also undertake selected commercial projects, including retail and office spaces, where spatial clarity and brand experience are key.
We provide full architectural services, guiding each project from concept to completion. This includes regulatory submissions, construction supervision, and hands-on coordination with consultants and builders throughout the process.
Each project begins with a renewed sense of curiosity — a careful study of the site, the brief, and the people it is designed for. Our approach is lifestyle-driven, rooted in context, and shaped by purpose. The result is thoughtful architecture that balances function, clarity, and emotion — built not just to stand, but to endure.

Interior Design
Our interior design practice is deeply integrated with our architectural thinking — creating a seamless transition between exterior and interior. We believe that great design should last, and that every space deserves to be both refined and livable.
From spatial planning to bespoke furniture design, every detail is approached with discipline and care. Materials are chosen for their honesty and character, forms are distilled to their essentials, and every space is tailored to reflect how our clients live.
The creation of space — within the context of environment, lifestyle, and meaning — is at the heart of our design ethos. We craft interiors that feel timeless, thoughtful, and personal, ensuring that the entire home resonates as a unified whole.

