Folded Grid House

Year

2022

Team

Damien Ng, John Lau

Location

Sennett Avenue

Area

5,500 sqft

Semi-Detached, Sennet Avenue

Poised at the intersection of two quiet lanes, The Folded Grid House embraces its dual frontage not as a constraint, but as an opportunity to project presence and privacy in equal measure.

The architecture is conceived as a series of stacked volumes — articulated in subtle shifts and recesses that break down the overall mass. Deep overhangs and framed openings lend rhythm to the façade, while material contrasts between stone, timber, and glass reflect a refined yet grounded palette.

Internally, the home is planned around light and flow. Full-height glazing at key corners captures natural light throughout the day, while creating framed views of greenery from within. Every turn of the corridor, every transition from room to room, has been considered to offer moments of openness and retreat — especially for multigenerational living.

On the street, the home presents a strong silhouette: dignified, confident, and calm. Yet beyond its sculpted exterior, The Folded Grid House is quietly domestic — designed with the rhythms of daily life

© 2026 Joya Architects Pre Ltd.

© 2025 Joya Architects Pre Ltd.