35 Jalan Haji Alias Unit 28

Year

2024

Team

Ivan Yang

Location

Jalan Haji Alias

Area

3,000 sqft
Joya Architects » Portfolio » Residential Interior Design » 35 Jalan Haji Alias Unit 28

Warm Minimalist Charm, Jalan Haji Alias

This home achieves remarkable airiness through extensive use of white walls and an open-plan layout in the main living areas, working together to bounce light and minimize visual obstruction.

The sense of nature is strongly integrated with the use of warm, natural wood and stones—visible in the open-tread staircase balustrade, kitchen cabinetry, introducing an organic, calming texture that contrasts beautifully with the white walls.

Natural materials like rattan and woven textures are used to soften the clean lines, truly bringing the outdoors in for a tranquil and grounded atmosphere. 

© 2026 Joya Architects Pre Ltd.

© 2025 Joya Architects Pre Ltd.