THE WHITECREST

Semi-Detached, Braemar Drive

At first glance, The Whitecrest feels almost silent — composed in white, framed in deep charcoal, its symmetry speaks with quiet authority. Yet behind the calm facade lies a home full of movement, warmth, and intention.

This is a house designed for modern family living, where every corner balances grace with functionality. Clean lines are softened by natural light. High ceilings meet thoughtful recesses.

Daylight filters through deep-set windows, creating shifting shadows that animate the space across time.

From arrival to retreat, the house reveals itself gradually — never overwhelming, always composed. It offers moments: a morning pause on the balcony, a walk down a light-filled corridor, an evening gathering framed beneath the corniced roofline.

There is no show here. Just balance. Stillness. Quiet confidence. A residence for those who value permanence over trend, craft over noise.

A home recalling tradition in form, but in spirit, entirely of the now.

Year

2023


Team

Lim Cheng Kooi, Zoe Lim, Brenda Lim, Aston Yap


Location

18 Ellington Square


Area

5,000 sqft

Photo credits : Marc Tan, Studio Periphery